Fingle Drive, Stonebridge Milton Keynes


Marlborough Developments - £1.2m

A design and build project comprising the construction of 18,000ft2 of warehouse sub-divided into 12 units.


Comprehensive reclamation, remediation and remodelling works were undertaken to bring this former Anglian Water sewage pumping site to a suitable condition ready for construction works to commence.


The extensive use of recycled materials, materials that comply with Green Guide “A” Rated Materials, FSC timber, Secure by Design, materials with 0-rated GWP and ODP, on site carbon monitoring, water and waste monitoring, high insulation and low “U” values, an air permeability of 3.6m3/(H.M2) all helped these units live up to their name “Stonebridge Eco”.


Finally a photovoltaic array was installed on the roof above each of the 12 units.  This provided the overall 10% renewable energy, generated on site to fully comply with the D4 planning policy.


Project Team 


Contact Us

5 Newton Court

Kelvin Drive


Milton Keynes



T: 01908 395000


Print Print | Sitemap
© Parkway Construction MK Ltd