Site E North, Knowlhill               Milton Keynes

Industrial & Commercial

Diceminster Limited - £1m

Diceminster Ltd

CS2

Woods Hardwick

T R Collier & Associates 

The design and build construction of a new  8,000ft2, 2 storey office building for Diceminster Limited  together with a new 70 space car park, bin store area, cycle facilities and all associated external  works.

 

This was a challenging site that had a 2m cut to one  boundary in order to facilitate the new car park. In  line with our green credentials, our land surveying  department identified a new finished floor level for  the building but also that there was a better solution  to the original design for the car park. This solution  would save the disposal of some 800m3 of arising’s to landfill. Our proposal was adopted into  the scheme which not only benefited our client, but also had a dramatic impact on the site waste management plan as well as a significant improvement on the CO2 impact of this development on the environment.

 

The new embankment formed to the car park was  redesigned and hydro-seeded for stabilization. The  car parking areas were block paved with drainage discharging through bypass separators. This drainage then combined with the roof water to outfall into the Loughton balancing lake system which has a very fragile ecosystem. As a result great care was required in the design stage to ensure this delicate balance was not disturbed. 

 

This office building has no square corners - every  elevation is angled to optimise not only the visual  impact of the building in its surroundings, but to also  assist with the solar shading and solar heat gains. The angled feature windows will focus the  occupiers eye on the spectacular views down the  adjacent park and lake complex. 

The construction of this units was traditional pad foundations to  support a steel framed structure. Then SFS walling formed the internal structure which was combined with masonry “monolithic” feature end walls, together with a series of curtain walling screens, ribbon windows and rain screen cladding which finishes off a very unusual build.

 

Sophisticated lighting and heating controls were  utilized with the whole system being controlled  through the Building Management System or via the  PC on your desk. A DDA compliant lift, LED lighting,  fire alarms, comprehensive access control systems,  intercom and keypad entry systems, full air  conditioning and mechanical ventilation, secure by  design construction, together with master key  access, all help to make this another prestigious  office project for our client.

Contact Us

5 Newton Court

Kelvin Drive

Knowlhill

Milton Keynes

MK5 8NH

 

T: 01908 395000

@: mail@parkwaymk.com 

Print Print | Sitemap
© Parkway Construction MK Ltd