Industrial

Fingle Drive Stonebridge, Milton Keynes

Client            Marlborough (Stonebridge) Limited    
Value   £1.2m
Project Team    

 

A design and build project comprising the construction of 18,000ft2 of warehouse sub-divided into 12 units.

 

Comprehensive reclamation, remediation and remodeling works were undertaken to bring this former Anglian Water sewage pumping site to a suitable condition ready for construction works to commence.

 

The extensive use of recycled materials, materials that comply with Green Guide "A" Rated Materials, FSC timber, Secure By Design, materials with 0-rated GWP and ODP, on site carbon monitoring, water and waste monitoring, high insulation and low "u" values, an air permeability of 3.6m3/(H.M2) all helped these units live up to their name " Stonebridge Eco"

 

Finally a photovoltaic array was installed on the roof above each of the 12 units. This provided the overall 10% renewable energy, generated on site to fully comply with the D4 planning policy.