Project Steel, Wednesbury
This project comprises of the modification and alterations to an existing 135.000ft2 building on a "build only" contract with an 18 week duration.
Works include the following:
- A combination of 81 pre-cast and insitu concrete dock leveller units
- Installation of 81 sets of dock levellers, dock shelters and wheel guides
- Complete insulation and over clad of building envelope
- Adaption of 103 door openings
- Installation of 30 new doors 15 into existing clad openings
- Removal of vehicle wash facility, fuel islands and pumps
- Extensive electrical modifications, renewal and replacement, including backup generator works
- Full building heating and ventilation installation
- Increased capacity services installation
- Plant decks, mezzanines, platforms, access stairs etc
- Internal accommodation extension
- External locker room / staff entrance extension
- Security extension
- Yard remedial works and white lining